Under the results of
competitive bidding carried out by TNK-BP, Moscow, GN Energy Engineering was
awarded with the Contract for carrying out the works on analysis and
assessment of the EPC-Contractor’s possible risks during implementation of the
Contract for construction of Unit No.3, “Nizhnevartovskaya GRES” power project
with a capacity of about 800 MW.
The scope of works
executed by GN Energy Engineering, includes:
• Elaboration of arrangement structure and algorithm for the EPC-Contractor’s sequence of activities during execution of works for construction of Unit No.3, “Nizhnevartovskaya GRES” power project on the “turn-key” basis;
• Elaboration of the Time Schedule for works execution indicating the costs of the works stages;
• Analysis of market and selection of subcontractors for execution of all types of works for the Project;
• Analysis of conditions for the Project construction and specific character of local conditions, assessment of the EPC-Contractor’s possible difficulties and risks as well as an elaboration of measures preventing and minimizing unforseen costs.